As for the type of charge pile, the household charge pile is roughly divided into two types: wall hanging type and standing pile type charge pile. The advantage of the wall hanging type is to save space and the price is low, but it must be installed on the wall that can be wired. The vertical price is high, and it will take up more space, but it can be installed in an empty parking lot around it.
Understand the type of district power supply, after surveying and negotiating the construction site, what you need to solve is the power supply problem. In fact, the most common use of charging piles for power supply is the common use of electricity by ordinary residents. We need to go to the national power grid to apply for power supply box alignment. If we pass the approval, the national power grid will send the corresponding staff to the door to route the wiring. In fact, the entire process is similar to the installation of optical fiber broadband.

In addition, if the community uses commercial high-voltage self-management, it can be described as a benefit and a disadvantage. Among them, the shortage is that the electricity price is much more than that of the people. The advantage is to eliminate the cumbersome process of dealing with the National grid. We can settle this by consulting with the property.
After confirming that the charging pile installation plan is correct, construction will begin. A few days after the survey and installation site, the construction party will give the corresponding installation plan, which is generally the installation cost and details, as well as the construction effect map. After the car and property confirm the price and materials are correct, the workers can be allowed to enter the entrance to install charging piles. If the National grid alignment is complete at this point, then your charging pile can be used normally after the connection.

If the fixed charging pile is not completed, a portable charger can be used for emergency response. Due to the involvement of multiple consultations, the speed of such construction will generally be slightly slower, and the cycle is generally normal for about one month. So in the absence of private charging piles, in addition to charging to public charging stations and 4S stores, it is also possible to use portable chargers for emergency use under the premise of ensuring safety, but "flying wire" charging is exposed after all. Therefore, it is not recommended to use it for a long time.

 

Flow and Safety Attention of Electric Vehicle Installation Charging Pile

1, the problem of fixed parking space is the first to bear the brunt
Make sure you install the charge pile, there may be some problems that will bother you. For example, whether there is a fixed parking space is a thorny issue. Even if some car friends have a fixed parking space for annual rent, a very small number of residential properties can be installed in order to facilitate management and avoid the trouble of dismantling the equipment after the rental. Therefore, they simply allow the rental of parking spaces to install charging piles. It is only after some owners purchase parking spaces. Can install charging equipment. Therefore, it is necessary to go to the property in advance to understand the parking space.
2.Security issues can not be ignored
The second is the safety issue. Due to the safety of others and public facilities, the property may come up with many questions, such as whether the charging pile will cause fire, leakage of electricity, short circuit, etc.. Therefore, the staff must be patient in the survey. Answer. Do not be angry because of the difficulties of the property, in fact, the importance of safety issues is also responsible for the safety of others.

Flow and Safety Attention of Electric Vehicle Installation Charging Pile
1, limited number of public charging sites
As it is in the development stage, the number of domestic charging stations is limited, and it is not possible to find charging piles in time.
2, limited number of equipment vehicles queuing to recharge time
Due to the limited number of domestic charging pile equipment, it is likely that when an open public charging station is found, it will encounter queuing for charging, which will seriously delay the charging time of motorists.
Electric vehicles installed charging pile flow and safety matters, many places installed charging pile after all is still in the initial stage, so the cooperation between the various departments will inevitably appear a variety of strange problems. We can all go to Feinite optical fiber website to understand and discuss these issues.